1.800.426.3929

1.800.426.3929

Outdoor Modular Sauna Kit | 2 Ft Overhang Installation

Covers installation of a 2 foot knee brace on the front of an 5×7 outdoor sauna kit

Placing the knees braces for a 2 ft overhang

Knee Braces Attached to Sauna Top Fascia

Toenail or screw horizontal 4×4 to the exterior top trim in level position

Set the gusset for the Knee Brace against the bevel siding

Setting Knee Brace for 2ft Overhang

Hold 4×4 knee brace up to the horizontal 4×4 and against the bevel siding close the edge of the front wall and scribe for the correct angle

Level the Knee Brace

Toe screw to the sauna walls to anchor in place

Set custom roof truss that is built different as the rest, on the knee braces as shown. Set back approx. 6” from the front of the knee brace

Front Truss sitting on the knee braces

roof install front truss sitting on knee brace

Front Truss Position

It’s optional to have the front truss sit at the very front of the knee braces. In this case, the home owner preferred in the middle of the top of the knee brace

fascia board instead of front truss
5x7 outdoor sauna kit with 2 ft overhang